How to Install Open Cell Insulation

104 40
    • 1). Seal the room you will be insulating and protect everything that cannot be moved outside the room using 2 mil plastic sheeting stapled or taped.

    • 2). Connect your foam apparatus following the manufacturer's manual. Make sure the hose from the tank to the foam gun is flat and not entangled. Prepare two 6-inch-plus screwdrivers and put masking tape at 2 and 4 or 6 inches.

    • 3). Dress in your disposable jumpsuit. Wear disposable gloves. Wear a respirator and a pair of protective glasses with peel away lens shields.

    • 4). Start spraying. Go from left to right between the wall studs, releasing the trigger at the end of each pass. Check that the first layer is around 2 inches deep using the screwdriver.

    • 5). Finish the first 2-inch layer around the room and come back to finish the second layer so the insulation is up to 4 to 6 inches.

    • 6). Use a paint scraper to remove any foam present on the studs. Use a level to locate and scrape down any piece of foam that is above the level of the studs.

Source...
Subscribe to our newsletter
Sign up here to get the latest news, updates and special offers delivered directly to your inbox.
You can unsubscribe at any time

Leave A Reply

Your email address will not be published.